CONSTRUCTION OF CHICKEN EGG WHITES LYSOSOME PRODUCTION HALL IN NOWA SÓL

The contract involved building a 6,000m2 production and storage hall. The hall comprises a number of facilities, including: a 2,000m2 produc- tion hall, a high-bay storage for storing finished products, raw materials storage, central heating boiler room and a steam boiler room of 4t/h efficiency. Additionally, drying rooms and a "CIP - Cleaning in Peace" hall, equipped with a sewage neutralizing tank, were built in the plant. An array of technological installations was provided, including: compressed air, technological heat, technological sewage and mecha- nical ventillation installations. 5 air handling units were installed in the hall, the largest of which boasts more than 58,000m3 efficiency. Specialist chemical-cleaning-resistant panels with an HDX coating dedicated for food industry were used to fit the plant. The grounds around the site, of a total area of 8,300m2, were also developed, by constructing roads and maneuvering areas and a public road exit. The contract was realized with financial support from the European Union as part of the Program Operacyjny Innowacyjna Gospodarka (Innovative Economy Operational Program).

Return to project list
Investor:OVOPOL SP. Z O.O.
Form:GENERAL CONTRACTOR
Value:10 - 20 mln
Project dates:April 2014 - June 2015
Get card icon get pdf card